Online Complaint    People's Sky View
 
 
 
 
 
    
 
   
 
       
    Home  
    Governing Body  
    Director General  
    Departments  
    KDA Directory  
    Photo Gallery  
    Video Gallery  
       
 
 
       
    KDA Introduction  
    Organization Chart  
    Tender Information  
    Tenders  
    Grand Auction  
    Notifications  
       
 
 
       
    Public Notice  
    Town Map  
    National Holidays  
    Prayer Timings  
       


 
 
 
 
     
  Director General Karachi Development Authority Altaf Gohar Memon along with Chief Engineer Samad Jamalani made an emergency visit to the ongoing development works on Shahrah Faisal.  
     
  11-Nov-2024  
     
   
     
  Director General Karachi Development Authority Altaf Gohar Memon along with Chief Engineer Samad Jamalani made a long emergency visit to the ongoing development works on Shahrah Faisal. During the visit, DG KDA Altaf Gauhar Memon not only reviewed the ongoing development works but also sought details from the suspended officials present on the spot. Chief Engineer Samad Jamalani while giving a briefing said that 7 digital arteries SMD are being installed on the 18 km long road from Airport to Shahrah Faisal Metropol Hotel, which will be installed on 4 entrances and 3 exits of the airport. Apart from this, in the first phase of Phase 1, RCC boundary wall is being constructed to hide the shops around Falknaz Tower, on which high quality material is being used, various mural designs will be made on the boundary wall, which will make the airport The beauty of the surroundings will increase further and the delegates coming from abroad will get a positive image of the city of Karachi. New plants and trees and modern style footpaths are being established on Shahrah Faisal while green belts, benches and lights are also being installed along the footpaths so that the citizens can enjoy the pleasant environment. He further informed DG KDA that the process of beautification on Shahrah Faisal and beautification of Drug Road underpasses is going on rapidly, there are strong possibilities that the development process will be completed before the stipulated period. The Chief Engineer briefed the DG KDA in detail about the obstacles during the completion of the project, after which the DG KDA issued instructions to the concerned authorities to remove all the obstacles and speed up the completion of the project. To be completed soon. During the visit, DG KDA was accompanied by Chief Engineer Samad Jamalani, Superintendent Engineer Mohibullah Jafari, Executive Engineer Rahat Fahim, Contractor Taj Manwar, JV Mansoor Engineering and other officers.  
     
     
 
News Photo Gallery
 
 
 
 
 

 
     
     

 

 

 

 

 
 
   
 

Copyright © 2016 Karachi Development Authority. All Rights Reserved.
The KDA will not be responsible for the content of external internet sites. / Login  / Webmail  

facebook   twitter   instagram